Description
For static grounding connected through a Scully Overfill Prevention Control System
- Ground Bolt is mounted directly to the vehicle frame and wired to the existing truck-mounted Scully Socket(s)
- Only one connection is needed for overfill prevention and ground verification when Using ST-47 Groundhog and Scully Overfill Prevention Control System
- Contains “smart” electronic circuitry that offers an intelligent return signal to the Groundhog™ Control Monitor